06:30 hours pre-start
07:00 hours calibration of air samplers
07:15 hour placement of air samplers adjacent to areas 1 and 2
07:20 hours inspection of liner on area 3 found to be satisfactory:

09:00 hours PM10s across site between 0.01 and 0.20 mg/m3 i.e. low dust levels.
Levels of dust upwind compatible to levels of dust downwind i.e. dust is not migrating offsite.
10:00 hours – area 6 liner being installed